Operations

J. Kamau — Nyeri Hub

Build a Deployment

IC-2054 · Meridian Fintech (demo)

Nakuru Corporate Training

Nakuru Business Park · Saturday, 19 September 2026 · 120 people · Zone D (168 km)

En Route
Illustrative demo data

Deployment lifecycle

  1. Confirmed
  2. Equipment Allocated
  3. Crew Assigned
  4. En Route
  5. On Site
  6. Setup Complete
  7. Active
  8. Collection
  9. Completed

Equipment allocation

7 of 7 units allocated

  • 10kVA Diesel Generator

    GEN-003 · Nyeri Hub

    Available
  • Modular Tent 9x12m

    TNT-014 · Nyeri Hub

    Reserved
  • PA System 1200W + 2 Wireless Mics

    PAS-007 · Nairobi Hub

    On Site
  • Modular Stage Deck 4x3m

    STG-002 · Nyeri Hub

    Dispatched

Crew assigned

  • Peter Mwangi (demo)

    Deployment Supervisor · 141 jobs · 4.8★

    Confirmed
  • Grace Wanjiru (demo)

    AV Technician · 88 jobs · 4.7★

    Confirmed
  • Dennis Kariuki (demo)

    Tent Technician · 112 jobs · 4.5★

    Confirmed
  • Alice Njeri (demo)

    Electrician · 63 jobs · 4.6★

    Unconfirmed

Incidents

  • High · Power · In Progress

    Generator load imbalance during setup; backup unit dispatched (demo).

    2026-09-19 11:12 · Operations — L. Achieng · KES 12,000

Job economics

Revenue
KES 62,000
Owned equipment allocation
KES 21,000
Partner rentals
KES 14,000
Transport
KES 16,500
Crew
KES 8,500
Fuel
KES 4,000
Consumables
KES 2,500
Direct cost
KES 38,900
Contribution margin
KES 23,100 · 37.3%

Low margin alert

Margin at 37.3% — below the 38% floor

Transport and partner rental are the largest cost drivers on this job.

  • Confirm zone pricing
  • Use owned stock where possible
  • Escalate to commercial lead

Logistics

Transport
Booked
Partner support
Confirmed
Sector
Fintech
Type
Training / Conference
Back to job queue